I always make the mistake of diving right into building something for 3 - 4 months and then launching and giving up when the launch is underwhelming.
This time I want to do two things differently:
1) By doing 3 launches I could at least compare them and declare a winner.
2) Seeing if there's a way to validate the ideas before building the MVP
So, is there something I could do to validate these ideas before committing to a build?